deutsch
english
wbk21_panorama
About us People Service Imprint Contact
mwm objects architecture practice hose
Home
P r e s s                1  |  2  |  3  
backhomeforward
Project development
Architecture
Living
Administration
Health
Business
Science & research
Culture
Sports & leisure
Professional planning
Presentation
Design
Involvement
Value appraisal
Links
"Locomotive Shed" – New construction of a fire station proportionately
of used prefabricated reinforced concrete elements, Thuringia

Our proposal for the urban site at a bypass considers a re-organisation of the area, whereby the guiding principle of cost-saving and area-saving follows the ideas of: including existing structures (farm, locomotive shed), an effective extent of utilization of available property surfaces (functional layering) and the elimination of unnecessary costs (minimized sealed areas, no demolition of the locomotive shed).

The design goal is to look at the site “locomotive shed” with the help of the realisation of the fire station, as potential long term development.

The building typology allows an optimized extension of the vehicle hall with its front-sided, two storey high social area, for. The original concept of the locomotive sheds remains.

Layout plan
Ground floor
Project information
Bauherr: Stadt Bad Liebenstein
Leistung: Neubau Feuerwehr Leistungsphase 1-4 nach §15 HOAI
Kosten: 611.000 €
Zeitraum: 2005
Büro: MWM objects
Visualization
Fire station
Bad Liebenstein
Community centre
Nottertal
©  2005  |  wbk21  |  kontakt  |  printable version