english
wbk21_panorama
About us People Service Imprint Contact
mwm objects architecture practice hose
Home
P r e s s e              1  |  2  |  3  
backhomeforward
Project development
Architecture
Professional planning
Prefabricated concrete
Preservation
Fire protection
Presentation
Design
Involvement
Value appraisal
Links
Conversion and refurbishment of a former "Kinderkombinaton"
(childrens’ combination) for an integrative day nursery

The "Arbeiterwohlfahrt (AWO)"” - workers’ aid organisation – area Mühlhausen is planning the refurbishment of its day nursery "Ufer-Knirpse".

The pressing extensive conversion of the KiKo (Kinderkombination) since the prefabricated concrete building from 1981 does not meet the current legal requirements and the accepted regulations for technology. Additionally, mentally disabled and handi- capped children should be looked after proportionally. This requires additional planning elements such as site utilisation and sanitary equipment.

We see the intended reconstruction measures (e.g. structural fire protection, thermal protection, sound insulation) not only as a chance to set an example for the residential area of "Feldstrasse" but to create a house a multitude of people.

Perspective
Floor plan ground floor
Project information
Developer: AWO Kreisverband Mühlhausen
Service: Reconstruction of an integrative day nursery
Costs: -
Period: 2004
Office: Archit. practice Hose
Garden elevation
High School
Lise-Meitner-
Gymnasium
"Mushroom bar" in concrete building
"House Pieper"
Fire station
Bad Liebenstein
Health oriented
day nursery
Integrative
day nursery
"Ufer-knirpse"
Old people’s geriatric care
©  2005  |  wbk21  |  kontakt  |  printable version