wbk21_panorama
"House Pieper" design for a detached house constructed proportionately
from used reinforced concrete elements, city of Werneuchen (Berlin)

This project, which is under construction at the settlement area of "Stienitzaue" in Werneuchen, north-east of Berlin, is exemplary for a demonstrative construction intend. Since planning permission is conferred the realization of the project will start in summer 2005 and the house will be ready for occupation this year.

A private developer would like to realize his own house based on ecological but also economical reasons by re-using used prefabricated concrete elements. The developer also appreciates, with the chosen construction, the possibility of saving money through a shortened construction period and his own maximum labour input (interior completion).

With a recycling degree of approx. 54% shell substance the construction costs of approx. 12% can be saved compared to a conventional construction method.

Visualization
Deconstruction location Reinforced concrete slab storage
Project information
Developer: private, Berlin
Services: construction of exterior, work phase 1-9 based on §15 HOAI
Costs: 139,600 €
Period: 2005
Office: MWM objects
Arrangement of the elements on the ground floor
wbk21   schillerstrasse 22   d 99096 erfurt   e-mail: mail@wbk21.de
fon: +49-361-34 63 905   fax: +49-361-34 63 906   net: www.wbk21.de